Plantwide Network and Control System Upgrade
TAI is providing turnkey services and design-build solution for the replacement of outdated PLC equipment throughout the Client’s facility. TAI is implementing a plant-wide control
Project Management > Page 2
TAI is providing turnkey services and design-build solution for the replacement of outdated PLC equipment throughout the Client’s facility. TAI is implementing a plant-wide control
The Water Wastewater Utility upgraded the disinfection system by replacing the existing gas chlorination system with a 12.5% sodium hypochlorite (NaOCl) on-site generation system. TAI
TAI provided preliminary engineering, design, documentation, and coordination services that focused on Electrical Power, Instrumentation, Automation & Controls for a new Valmet Smelt Spout Robot
TAI provided critical resources to serve in an Owner’s Representative capacity and played an integral role in the successful design, construction, and operation of this