Project > Page 7
TAI’s provided upgrades to a three-story Core and Shell building including ew rooftop HVAC units, new electrical service, water and sewer distribution, and basement level
TAI provided preliminary engineering, design, documentation, and coordination services that focused on Electrical Power, Instrumentation, Automation & Controls for a new Valmet Smelt Spout Robot
TAI’s Client wanted to improve efficiency by increasing their food-handling capabilities in-house at their facility located in Stuarts Draft, VA. Formerly, the Client was transporting
TAI was called upon to provide steam decentralization engineering services. The buildings’ heating systems were removed from the steam plant and provided with a gas
TAI provided critical resources to serve in an Owner’s Representative capacity and played an integral role in the successful design, construction, and operation of this
TAI worked as the mechanical and electrical subconsultant for the design and engineering improvements of two secure rooms and one server room for the Client’s
TAI’s site safety and maintenance services were deployed to surface prep, seal and coat the exterior surface of two bulk storage silos for a client
TAI reviewed and analyzed the construction of a 100-gallon mixing mezzanine at the Client’s facility to determine if the placarded 150 psf uniform live load
This project included the relocation of blending and filtering operations to a new location during a plant shutdown. The relocation included the conversion of tanks